010-020 returned this year to Ventura Lambrate to present work by up-and-coming designers like Studio WM, Lex Pott, Earnest Studio, and Mae Engelgeer.
010-020 returned this year to Ventura Lambrate to present work by up-and-coming designers like Studio WM, Lex Pott, Earnest Studio, and Mae Engelgeer.
Designed by Sydney-based practice Akin Atelier, this Bondi Beach abode is comprised of two volumes connected by a central courtyard that draws in natural light. The orientation of the 2,010-square-foot home allows for a playful rhythm of light, shadow, and air that gives it its atmospheric name, Cloud House.
Designed by Sydney-based practice Akin Atelier, this Bondi Beach abode is comprised of two volumes connected by a central courtyard that draws in natural light. The orientation of the 2,010-square-foot home allows for a playful rhythm of light, shadow, and air that gives it its atmospheric name, Cloud House.
Marble slabs being acclimatized, prior to production, 2013. Photography by Knoll.
Marble slabs being acclimatized, prior to production, 2013. Photography by Knoll.
0507225_0714_ 010
0507225_0714_ 010
Pre-stained cedar is stacked at the job site waiting for installation. The cedar was left for on-site for eight weeks to acclimatize. Cedar siding swells or shrinks when it gains or loses moisture while it reaches equilibrium with the content of the surrounding air. Ensuring the cedar is acclimatized before it is installed will minimize movement later on.
Pre-stained cedar is stacked at the job site waiting for installation. The cedar was left for on-site for eight weeks to acclimatize. Cedar siding swells or shrinks when it gains or loses moisture while it reaches equilibrium with the content of the surrounding air. Ensuring the cedar is acclimatized before it is installed will minimize movement later on.
dwell Residency: 010
dwell Residency: 010
010 Master Bedroom 01
010 Master Bedroom 01
The house wrapped in Tyvek paper and two layers of black building paper. The black cedar siding sits on site acclimatizing prior to installation.
The house wrapped in Tyvek paper and two layers of black building paper. The black cedar siding sits on site acclimatizing prior to installation.