For Bret and Dani Stone’s house in Santa Barbara, California, Barber Builders erected a concrete-and-steel ground level capable of supporting a second story made mostly of shipping containers. While the project as a whole took 19 months, the containers were craned into place in a single day in 2016.
Wheelhaus founder and CEO Jamie Mackay creates prefabs with the same quality and durability of the log cabins he grew up with, while also incorporating his values of green production and modern design. Although it takes about four months to construct his prefabricated properties, it takes about a week for the home to be delivered, and then three to five days for the house to be set up on site.