Collection by C Fraulino
Woodworkers Justin and Kathleen Brady from Bell Buckle, Tennessee, transformed a 1976 GMC Motorhome into a mobile dwelling to be used for weekend getaways and their annual pilgrimage out west. The couple had to work meticulously to make the most of the 150-square-foot space, and they got creative with cabinetry and millwork throughout.
KitHAUS recently completed this custom k9 project in Highland Park, California. The project took approximately six months, with the majority of that time spent waiting for approval from the City of Los Angeles. Shipment of a kitHAUS typically takes about eight to 14 weeks from the time of deposit to delivery.
Want a peek at the future of prefab design? Meet the Cube One—a 156-square-foot dwelling with built-in furnishings, voice-controlled tech, and a galvanized steel shell that can withstand extreme heat and natural disasters. Singapore-based Nestron will ship the Cube One anywhere in the world, and it’ll be ready for move-in the day it arrives.
27 more saves