Collection by Jonathon Schwartz
General
When the firm first arrived on the site, the second floor of the property was so badly damaged that it was at risk of collapsing. The first floor was remade with shotcrete for reinforcement, and two walls of the first floor were “rebuilt in rendered polystyrene blockwork to reduce the weight of the building while providing a thick insulating layer,” Simpson says.