West Hollywood ADU
Details
Credits
From CentrePoint Construction Inc.
CentrePoint Construction recently completed a . We matched cedar lap siding to the 1920s main house, installed custom wood windows, and used reversible structural ties so the original fabric remains intact. Despite seven major rain events, we finished the build in just 12 weeks by tenting concrete pours, scheduling just-in-time lumber deliveries, and running weekend crews to regain lost days.
The ADU sits on a shallow perimeter stem wall with a slab-on-grade interior, framed in FSC-certified Douglas fir and reinforced with Simpson Strong-Tie hardware sized for seismic Zone 4. A high-performance envelope—ZIP System sheathing, rock-wool insulation, and a vented roof—meets Title 24, while interior finishes include oak built-ins, quartz counters, and period-appropriate Craftsman trim milled on-site. Mechanical systems feature a high-efficiency mini-split, low-flow fixtures, and a dedicated sub-panel ready for future solar.