Dwell Home Venice: Part 17

In this series, Sebastian Mariscal designs a home in Venice, California, that brings the outside in. We track the project from start to finish with future resident Michael Sylvester. Part 17, August 2012 – January 2013: Installing the siding.

The wood siding of the house is a knotty grade of Western Red Cedar which has been ebony stained twice on both sides.

Dwell Home Venice: Part 17 - Photo 1 of 13 -

A close-up of the knotty grade cedar waiting to be installed.

Dwell Home Venice: Part 17 - Photo 2 of 13 -

A cross-section showing how the cedar is milled. The top and bottom of each board slopes down and away from the building paper. In the event any water enters between two boards it will wick away from the wall.

Dwell Home Venice: Part 17 - Photo 3 of 13 -

A drawing from Sebastian Mariscal Studio shows the siding detail at outside corners.

Dwell Home Venice: Part 17 - Photo 4 of 13 -

A mock-up model of the siding was created early in the process. This was useful for understanding design details and installation methods. The mock-up shows the black building paper and a detail of an outside corner joint. The image shows bronze screws but we changed to galvanized deck screws for budget reasons.

Dwell Home Venice: Part 17 - Photo 5 of 13 -

These galvanized deck screws hold the siding tight onto the sheer wall. Over 48,000 screws were used in the project.

Dwell Home Venice: Part 17 - Photo 6 of 13 -

A section of siding completed in the bedroom courtyard.

Dwell Home Venice: Part 17 - Photo 7 of 13 -

A corner detail outside the den/office. The red lines on the black paper are snapped chalk lines marking where the screw lines should be.

Dwell Home Venice: Part 17 - Photo 8 of 13 -

In this image the middle worker is using a jig to drill a screw hole exactly aligned with a red chalk-snapped vertical line marked on the black paper. The use of a jig with pre-drilled holes is critical to ensuring that the screws stay lined up vertically.

Dwell Home Venice: Part 17 - Photo 9 of 13 -

The pieces of blue tape on the walls display elevation marks which have been established by laser. This ensures the siding does not slowly creep up or down hill as the workers move across a wall. As the siding wraps around a volume, the last board must arrive at the same elevation as the first board.

Dwell Home Venice: Part 17 - Photo 10 of 13 -

The top of the walls receive a piece of cedar acting as coping or top cap.

Dwell Home Venice: Part 17 - Photo 11 of 13 -

The pine needle courtyard with the siding complete.

Dwell Home Venice: Part 17 - Photo 12 of 13 -

The volumes of the house become more sharply defined as the siding is completed.

Dwell Home Venice: Part 17 - Photo 13 of 13 -

Pre-stained cedar is stacked at the job site waiting for installation. The cedar was left for on-site for eight weeks to acclimatize. Cedar siding swells or shrinks when it gains or loses moisture while it reaches equilibrium with the content of the surrounding air. Ensuring the cedar is acclimatized before it is installed will minimize movement later on.

m
Michael Sylvester
Michael Sylvester is a writer who lives in both Los Angeles and an aisle seat, preferably in the exit row.

Published

Last Updated

Get the Dwell Newsletter

Be the first to see our latest home tours, design news, and more.

Comments
Private
Start a public conversation on this article by adding your comments below.