Girodo describes LEAPfactory’s architecture as being “molded according to the needs and stresses imposed by context.” In this setting, strong winds and snow loads are serious concerns. The shell’s composite sandwich panels and aluminum shingles ensure that the school can withstand the elements.  Photo 17 of 21 in CUBE by Bruce Fratezi from This Prefab Ski School in the Alps Took 10 Days to Assemble

CUBE

17 of 21

Girodo describes LEAPfactory’s architecture as being “molded according to the needs and stresses imposed by context.” In this setting, strong winds and snow loads are serious concerns. The shell’s composite sandwich panels and aluminum shingles ensure that the school can withstand the elements.