Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Search “fbm타워점【COBIT7.COM】김팀장점ㅢFXFBMㄱ아이포렉스※fbm3만원F에프비엠ㅻFBM지점IJFBM거래소㈚FBM트레이딩®abrasion” from Diamond in the Rough (and Ready)

Search “fbm타워점【COBIT7.COM】김팀장점ㅢFXFBMㄱ아이포렉스※fbm3만원F에프비엠ㅻFBM지점IJFBM거래소㈚FBM트레이딩®abrasion”

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.