Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Search “텔레@BSECRET7살인청부자탐정사무실전국탐정사무실살인청부자탐정사무실전국탐정사무실” from Diamond in the Rough (and Ready)

Search “텔레@BSECRET7살인청부자탐정사무실전국탐정사무실살인청부자탐정사무실전국탐정사무실”

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.