Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Search “텔레@BSECRET7복수해주실분운행정지차량찾아주는곳복수해주실분운행정지차량찾아주는곳” from Diamond in the Rough (and Ready)

Search “텔레@BSECRET7복수해주실분운행정지차량찾아주는곳복수해주실분운행정지차량찾아주는곳”

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.