Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Search “용산오피[【bam7"넷 】]용산오피㌇용산오피달리자ꈏ밤달ᕨ용산오피녀ங오피사이트ј용산오피ꅝ용산립카페” from Diamond in the Rough (and Ready)

Search “용산오피[【bam7"넷 】]용산오피㌇용산오피달리자ꈏ밤달ᕨ용산오피녀ங오피사이트ј용산오피ꅝ용산립카페”

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.