Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Search “경산오피[【bam7"넷 】]경산오피ㆊ경산오피가자ꆼ밤달܊경산여대생ឋ오피사이트⑦경산오피យ경산풀사롱” from Diamond in the Rough (and Ready)

Search “경산오피[【bam7"넷 】]경산오피ㆊ경산오피가자ꆼ밤달܊경산여대생ឋ오피사이트⑦경산오피យ경산풀사롱”

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.