Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Search “信用盘源码程序【复制网站bb929.net】信用盘源码程序7” from Diamond in the Rough (and Ready)

Search “信用盘源码程序【复制网站bb929.net】信用盘源码程序7”

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.