Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Search “"비트맥스"【COBIT7.COM】총판V김제점#비트파이가맹점₁비트월드ⓛ고객센터㉣비트소닉하한가%fx시티플래티넘한국점⑭Abelite” from Diamond in the Rough (and Ready)

Search “"비트맥스"【COBIT7.COM】총판V김제점#비트파이가맹점₁비트월드ⓛ고객센터㉣비트소닉하한가%fx시티플래티넘한국점⑭Abelite”

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.