Girodo describes LEAPfactory’s architecture as being “molded according to the needs and stresses imposed by context.” In this setting, strong winds and snow loads are serious concerns. The shell’s composite sandwich panels and aluminum shingles ensure that the school can withstand the elements.  Photo 2 of 7 in Scandinavian from This Prefab Ski School in the Alps Took 10 Days to Assemble

Scandinavian

2 of 7

Girodo describes LEAPfactory’s architecture as being “molded according to the needs and stresses imposed by context.” In this setting, strong winds and snow loads are serious concerns. The shell’s composite sandwich panels and aluminum shingles ensure that the school can withstand the elements.