Although little was done to alter the building’s original form, the firm did demolish an extension that was the site of a mechanical plant. This alteration allowed for an outdoor deck covered with timber decking by Chemisys Group.  Photo 1 of 5 in Favorites by Erick Schonfeld from Water Factory

Favorites

1 of 5

Although little was done to alter the building’s original form, the firm did demolish an extension that was the site of a mechanical plant. This alteration allowed for an outdoor deck covered with timber decking by Chemisys Group.

Also Appears In