Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.  Photo 5 of 13 in Diamond in the Rough (and Ready)

Diamond in the Rough (and Ready)

5 of 13

Rocks dug up during construction were saved and incorporated into the poured-concrete floors and walls. Hydronic heating coils in the floor are augmented by a wood stove during the damp winters.

Also Appears In