Hybrid Architecture prefab

Search “北京电影学院2004表演系历届名单【A+货++微mpscp1993】”

Known as the "project that kicked off Cargotecture," Hybrid’s Studio 320 was fabricated in 2004 and delivered to Enumclaw, Washington. The interior is lined in reclaimed plywood formerly used on the bleachers of a local high school gym.