Installation started at 11 a.m. and the second floor was stacked by 3 p.m. later that same day.

  Search “p3텔레그램RADARDB_~)마사지DB상담$!ㅡ” from A Shipping Container Prefab Lab Is Built in Only 4 Hours

Search “p3텔레그램RADARDB_~)마사지DB상담$!ㅡ”

Installation started at 11 a.m. and the second floor was stacked by 3 p.m. later that same day.