The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.  Search “Harmonywss節點租用『🍀網站node123·xyz🍀』】涂科边mh” from Music By Design

Search “Harmonywss節點租用『🍀網站node123·xyz🍀』】涂科边mh”

The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.

Appears In