The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.  Search “Arbitum+Nova全節點購買『🍀网站node123·xyz🍀』】酒持滦ec” from Music By Design

Search “Arbitum+Nova全節點購買『🍀网站node123·xyz🍀』】酒持滦ec”

The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.

Appears In