Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “(✔️访问bet91.net)手动输入-极速时时彩技巧APP下载-极速时时彩技巧网站-极速时时彩技巧登录(✔️访问bet91.net)手动输入” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “(✔️访问bet91.net)手动输入-极速时时彩技巧APP下载-极速时时彩技巧网站-极速时时彩技巧登录(✔️访问bet91.net)手动输入”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.