Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “(✔️访问900bet.net)手动输入-安卓网安卓资讯栏目站点详情数据-安卓网安卓资讯栏目站点详情数据网址-安卓网安卓资讯栏目站点详情数据APP下载-二次元百科-(✔️访问900bet.net)手动输入” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “(✔️访问900bet.net)手动输入-安卓网安卓资讯栏目站点详情数据-安卓网安卓资讯栏目站点详情数据网址-安卓网安卓资讯栏目站点详情数据APP下载-二次元百科-(✔️访问900bet.net)手动输入”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.