Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “(✔️访问900bet.net✔️)-hg2088足球-hg2088足球APP-hg2088足球官方版APP-秒懂百科-(✔️访问900bet.net✔️)” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “(✔️访问900bet.net✔️)-hg2088足球-hg2088足球APP-hg2088足球官方版APP-秒懂百科-(✔️访问900bet.net✔️)”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.