Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “(✔️网址bet91.net)手动输入-大家用的什么软件买球-大家用的什么软件买球官方网址-大家用的什么软件买球登录-头条百科” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “(✔️网址bet91.net)手动输入-大家用的什么软件买球-大家用的什么软件买球官方网址-大家用的什么软件买球登录-头条百科”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.