Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “(✔️网址900bet.net)手动输入-澳门金沙游戏中心-澳门金沙游戏中心网址-澳门金沙游戏中心官方版APP-搜狗百科” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “(✔️网址900bet.net)手动输入-澳门金沙游戏中心-澳门金沙游戏中心网址-澳门金沙游戏中心官方版APP-搜狗百科”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.