Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “(✔️网址900bet.net)手动输入-澳门直营网赌官网-澳门直营网赌官网官网-澳门直营网赌官网登录-问问百科” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “(✔️网址900bet.net)手动输入-澳门直营网赌官网-澳门直营网赌官网官网-澳门直营网赌官网登录-问问百科”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.