Installation started at 11 a.m. and the second floor was stacked by 3 p.m. later that same day.

  Search “일산오피【뜨거운밤】일산오피≤PM030。COM≥화제⑳일산오피ᓙ일산스파ꄤ일산오피㋕일산페티쉬ж일산OPւ일산풀싸롱” from A Shipping Container Prefab Lab Is Built in Only 4 Hours

Search “일산오피【뜨거운밤】일산오피≤PM030。COM≥화제⑳일산오피ᓙ일산스파ꄤ일산오피㋕일산페티쉬ж일산OPւ일산풀싸롱”

Installation started at 11 a.m. and the second floor was stacked by 3 p.m. later that same day.

Appears In

A Shipping Container Prefab Lab Is Built in Only 4 Hours