The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.  Search “성남오피【www.OP030.컴】오피그렘귀요미ꆑ선릉OPе선릉오피ម선릉건마ވ 선릉세미룸☇선릉kissᔢ선릉오피” from NYC Home Renovations

Search “성남오피【www.OP030.컴】오피그렘귀요미ꆑ선릉OPе선릉오피ម선릉건마ވ 선릉세미룸☇선릉kissᔢ선릉오피”

The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.