Installation started at 11 a.m. and the second floor was stacked by 3 p.m. later that same day.

  Search “선릉오피≪PM030,컴≫선릉건마 선릉오피 선릉오피 선릉마사지 선릉스파 선릉안마 선릉kiss” from A Shipping Container Prefab Lab Is Built in Only 4 Hours

Search “선릉오피≪PM030,컴≫선릉건마 선릉오피 선릉오피 선릉마사지 선릉스파 선릉안마 선릉kiss”

Installation started at 11 a.m. and the second floor was stacked by 3 p.m. later that same day.

Appears In

A Shipping Container Prefab Lab Is Built in Only 4 Hours