The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.  Search “대구오피【OP030_com】오피그렘강림ꇼ대구스파ꌛ대구오피Ժ대구하드코어ᗶ대구출장ꌯ대구오피ꎌ대구Hugetel♐대구룸사롱” from NYC Home Renovations

Search “대구오피【OP030_com】오피그렘강림ꇼ대구스파ꌛ대구오피Ժ대구하드코어ᗶ대구출장ꌯ대구오피ꎌ대구Hugetel♐대구룸사롱”

The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.