The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.  Search “구미오피(구미오피)≤≤OP080.com≥≥모집✿구미오피մ구미룸싸롱 구미휴게텔 구미건마ᚹ구미OP 구미업소 구미테라피” from NYC Home Renovations

Search “구미오피(구미오피)≤≤OP080.com≥≥모집✿구미오피մ구미룸싸롱 구미휴게텔 구미건마ᚹ구미OP 구미업소 구미테라피”

The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.