The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.  Search “강서오피ծ op080。com강서오피ᗾ강서업소Ձ강서키스방౩강서아로마㋤강서opᙶ강서안마” from NYC Home Renovations

Search “강서오피ծ op080。com강서오피ᗾ강서업소Ձ강서키스방౩강서아로마㋤강서opᙶ강서안마”

The architects had to gain approval from the co-op board to break through to the roof—the loft is on the top floor—and add a terrace and master bedroom suite.