VDC SUMMARY exterior

Search “강남아이디레깅스룸문의oio46480930강남헐리우드 강남룸싸롱 셔츠룸싸롱 강남유흥 테란셔츠룸 선릉하이킥ℂ 선릉란제리 ℇ하이킥레깅스룸 강남하이킥ℕ final”

The concrete modules were prefabricated off-site and fitted with insulation, electrical sockets and switches, technical rails, and all mechanical connectors before they were transported to the site for final assembly.