The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.  Search “离婚后需要再办房产证【办证刻章加微hao123bbs】” from Music By Design

Search “离婚后需要再办房产证【办证刻章加微hao123bbs】”

The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.

Appears In