Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “【✔️输入㊙️bet91.net✔️】-中国十大网赌正规排名官方网址-中国十大网赌正规排名登录-中国十大网赌正规排名官方网站【✔️输入㊙️bet91.net✔️】” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “【✔️输入㊙️bet91.net✔️】-中国十大网赌正规排名官方网址-中国十大网赌正规排名登录-中国十大网赌正规排名官方网站【✔️输入㊙️bet91.net✔️】”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.