Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.  Search “【✔️访问㊙️bet91.net✔️】-买球靠谱的软件APP-买球靠谱的软件网址-买球靠谱的软件官网【✔️访问㊙️bet91.net✔️】” from This Net-Zero Residence Might Be the Greenest Home in San Francisco

Search “【✔️访问㊙️bet91.net✔️】-买球靠谱的软件APP-买球靠谱的软件网址-买球靠谱的软件官网【✔️访问㊙️bet91.net✔️】”

Designed and prototyped by David Baker Architects, the building’s siding was made from salvaged maple flooring left over from another project. Inspired by the Japanese and Finnish practice of finishing exterior wood by charring, Baker used a roofing torch to char the boards and screwed them into vertical cedar battens.