The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.  Search “‼선제작 [카톡 TZB123] [텔레 TZB333] 졸업증명서제작 졸업증명서위조 졸업증명서제작 대학졸업증명서위조‼” from Music By Design

Search “‼선제작 [카톡 TZB123] [텔레 TZB333] 졸업증명서제작 졸업증명서위조 졸업증명서제작 대학졸업증명서위조‼”

The master studio and session rooms occupy the space of the building’s former basement loading dock. The tall ceilings this area offered are ideal for the recording environment. A 10 to 15 inch concrete slab was poured to buffer sound and movement from the nearby 1,2,3 line. © Greg Irikura 2013.

Appears In