Although little was done to alter the building’s original form, the firm did demolish an extension that was the site of a mechanical plant. This alteration allowed for an outdoor deck covered with timber decking by Chemisys Group.  Photo 6 of 9 in Water Factory by Kelly Dawson

Water Factory

6 of 9

Although little was done to alter the building’s original form, the firm did demolish an extension that was the site of a mechanical plant. This alteration allowed for an outdoor deck covered with timber decking by Chemisys Group.