BEFORE - The rear deck (before the total update), and the brick rear of the building with excessive thermal bridging and heat loss in the winter. (Cold and drafty).  Photo 5 of 21 in SouthEnd RowHome by ZeroEnergy Design

SouthEnd RowHome

5 of 21

BEFORE - The rear deck (before the total update), and the brick rear of the building with excessive thermal bridging and heat loss in the winter. (Cold and drafty).