Comprising 11 modules, this green-roofed prefab was built in 90 days in a factory near São Paulo and then transported to the site in three shipments on flatbed trucks.
The design provides ample outdoor deck space—including a covered portion at left, to make up for the lack of a yard on this sloping site.