A new residential building in upper Manhattan, dubbed The Stack and designed by the architecture firm Gluck+, employed offsite prefabrication methods to create a high-quality, affordable housing solution that was raised onsite in only 19 days.  Photo 2 of 6 in Prefabs Assembled in 6 Weeks or Less by Heather Corcoran from It Took Less Than a Month to Assemble this Entirely Modular Apartment Building in NYC

Prefabs Assembled in 6 Weeks or Less

2 of 6

A new residential building in upper Manhattan, dubbed The Stack and designed by the architecture firm Gluck+, employed offsite prefabrication methods to create a high-quality, affordable housing solution that was raised onsite in only 19 days.