KitHAUS recently completed this custom k9 project in Highland Park, California. The project took approximately six months, with the majority of that time spent waiting for approval from the City of Los Angeles. Shipment of a kitHAUS typically takes about eight to 14 weeks from the time of deposit to delivery.
In Kansas City, Missouri, a family sought to construct a new home using prefabricated structural insulated panels (SIPS) instead of traditional frame construction. The entire kit house is composed of 4' x 8' sections, and the shell was constructed in about a week. The project’s relatively low cost, quick build time, and highly insulated envelope were positives, but the panels also have their limitations. “Most SIP projects look pretty stupid,” Jamie says. “They haven’t been manipulated by someone who’s thinking creatively.” In this case, Jamie augmented the simple panel system with a dynamic cantilever.
Builders, developers, designers, and architects have developed a range of homes that are composed of prefabricated, modular, or kit-of-parts pieces that can allow for lower costs, faster and easier on-site construction, and even higher quality spaces. Here, we delve into the differences—and similarities—among these manufactured residences.