Toggle Zoom
Using prefabricated materials for the exterior allowed Koehler and his team to drastically reduce building time during the construction phase. Cross-laminated timber panels (CLT), laser cut in the factory and assembled at the site within two weeks, add structure and aesthetic interest to the top of the home.  Off the grid by Michela O'Connor Abrams from Modern Houses with Dramatic Angles
Click to comment