Collection by Richard Scheig
Favorites
“Many of our customers watch remodel shows on television for inspiration and are under the impression that an entire kitchen can be remodeled in a few days,” explains Carter. “We explain it can typically take up to 12 weeks for a complete remodel and two to six weeks for a ‘swap the top,’ new paint, and appliances.”
The workshop interiors emphasize function, with polished concrete slab floors and 35-foot-high ceilings to accommodate large projects and gatherings. The disco ball, set to spin via a smartphone app, can be lowered with an industrial winch and is visible from the overhead studio suite through a peek-a-boo window.
133 more saves



















