Collection by KAROL PYSZ

Favorites

Skigard Hytte floor plan
Skigard Hytte floor plan
The diagonals of the skigard are made of hand-split spruce, while the uprights are juniper. The couple used local woodworkers for the build.
The diagonals of the skigard are made of hand-split spruce, while the uprights are juniper. The couple used local woodworkers for the build.
The Majamaja Cabin by Littow Architectes was constructed on-site from prefab wood panels and without the use of heavy machinery. The self-contained unit makes for a perfect eco-retreat, especially when positioned at water’s edge in Finland.
The Majamaja Cabin by Littow Architectes was constructed on-site from prefab wood panels and without the use of heavy machinery. The self-contained unit makes for a perfect eco-retreat, especially when positioned at water’s edge in Finland.
The roughly 160-square-foot modules, dubbed Mini House 2.0, were built in collaboration with Swedish manufacturer Sommarnöjen, and are delivered flat-packed. The homes are painted wood, and include a shaded deck space, plus full insulation and electricity, for a price of about $29,000. The modules come in various layouts, and can be configured and combined to include a kitchen, bedroom, bathroom, and living space.
The roughly 160-square-foot modules, dubbed Mini House 2.0, were built in collaboration with Swedish manufacturer Sommarnöjen, and are delivered flat-packed. The homes are painted wood, and include a shaded deck space, plus full insulation and electricity, for a price of about $29,000. The modules come in various layouts, and can be configured and combined to include a kitchen, bedroom, bathroom, and living space.
Top 9 Prefabs of 2020: These best-in-class prefabricated homes are vying for your vote in the Dwell Design Awards.
Top 9 Prefabs of 2020: These best-in-class prefabricated homes are vying for your vote in the Dwell Design Awards.
Using a steel structure posed challenges for both the design and construction process, say the architects. “It required high accuracy and none of the elements were repeatable.”
Using a steel structure posed challenges for both the design and construction process, say the architects. “It required high accuracy and none of the elements were repeatable.”