Using prefabricated materials for the exterior allowed Koehler and his team to drastically reduce building time during the construction phase. Cross-laminated timber panels (CLT), laser cut in the factory and assembled at the site within two weeks, add structure and aesthetic interest to the top of the home.  Photo 10 of 63 in Favorites by Colton Schniepp from Modern Houses with Dramatic Angles

Favorites

10 of 63

Using prefabricated materials for the exterior allowed Koehler and his team to drastically reduce building time during the construction phase. Cross-laminated timber panels (CLT), laser cut in the factory and assembled at the site within two weeks, add structure and aesthetic interest to the top of the home.

Also Appears In