Although little was done to alter the building’s original form, the firm did demolish an extension that was the site of a mechanical plant. This alteration allowed for an outdoor deck covered with timber decking by Chemisys Group.  Photo 1 of 10 in Renovations by Samuel Joung from Water Factory

Renovations

1 of 10

Although little was done to alter the building’s original form, the firm did demolish an extension that was the site of a mechanical plant. This alteration allowed for an outdoor deck covered with timber decking by Chemisys Group.

Also Appears In