With a construction budget of less than $200 per square foot, architect Les Eerkes (with the mentorship of Tom Kunding) looked for ways to build the structure efficiently. He specified glulam—glued laminated timber—for the structure and spanned the skeleton with structurally insulated floor and roof panels. The structure is stationed atop a six-column foundation. "The 'six-footed' solution was balanced against a spread footing and stem wall approach," Eerkes says. "Cost analysis led us in the direction of the column footing approach because it minimized excavation and form work costs."