Favorite
Save
Here's the site as it looked the day before the modules arrived. The concrete block wall foundation, fireplace, basement, and utilities are all in place. Previously, Marmol Radziner, their trucking company, and the crane company had all scouted the site "to understand the topography, road alignments and road grades, and to evaluate trees and natural features of the landscape which would potentially be obstacles to bringing the modules into the Ranch and to our site," says Bill.  Building a Prefab House by Jaime Gillin